tekWorx Empowers JCI Client to Slash Operating Costs 68%

bayfront1-resized-600

BAYFRONT AT A GLANCE

  • 480-bed private hospital
  • 75,000 ft2
  • Over 3,000 employees
  • (4) York chillers
  • 2,575 tons installed cooling capacity

APPROACH

  • Convert plant to Integrated Primary/Secondary® design
  • Reconfigure tertiary pumps to alleviate system pressure problems and eliminate wasted energy
  • Add VFDs to all building pumps to eliminate wasted pump energy
  • Design and install PLC based adaptive control algorithms to ensure maximum chiller loading, optimal control of all CHW pumps and proper balance of cooling towers and chillers

IMPLEMENTATION

  • CEO ® system connected directly to JCI Metasys system via BACnet IP protocol, allowing tekWorx to gather real-time data on temperatures, flows, etc., and to fully control all plant equipment
  • Failover sequence developed and implemented to address control redundancy
  • No plant downtime during the course of this project
  • All major equipment remained in operation during commissioning

RESULTS

  • Manually operated system operating at 1.1kW/ton is now a real-time adaptive control system operating at .75 kW/ton
  • System experiences much less wear and tear
  • Operators are now freed up to perform other important tasks
  • CEO® User Interface has provides the staff with better insight into the system for diagnostics and trouble shooting

To learn more about this study and to see how tekWorx can help to optimize your plant, visit www.tekWorx.us

Sustainability: A Treasure Hunt for a Better Energy Solution

skull and bones recycle

When we hear the term “sustainability,” we automatically think of the trends that have been surfacing in our world over the past couple of years. Questions like “How can we make our world greener?” or “How can we save energy and resources?” seem to appear everywhere. Although awareness has been raised, the basic fixes like recycling and turning off lights are simply not enough to solve the problem. The real solutions for going green and industrial energy usage dilemmas can deceive us by appearing more complicated than they really are. Treasure hunts are one solution to these problems. As a strategy that helps to bring several skills into play, treasure hunts involve a team of employees working together to evaluate and assess the energy consumption in a facility. These different perspectives, knowledge, and expertise join together to create a customized energy efficiency solution.

An inevitable find in these commercial and industrial treasure hunts is the hidden cost of cooling. By recovering this wasted energy, companies not only become more energy conscious but also end up saving money (treasure) while going green—an ideal solution. Sustainability, energy efficiency, and treasure hunts go hand-in-hand and when done correctly provide major kWh savings, sparing the pain of expensive energy bills.

tekWorx reduces the energy usage for customers by optimizing chilled water plant production. tekWorx CEO® system not only helps the environment by controlling the amount of resources used, it also prevents unnecessary spending through its customized adaptive control algorithms. Check out our chiller plant evaluation forms to see how much energy your plant can save with a customized control system from our Approachable Expertise® team. We’re here to make our world (and your wallets) a little greener!

Verizon Retrofit Saves $85,000 a Year

verizonbuilding-resized-600

Retrofitting a large central plant may seem overly daunting, especially for companies that deal with mission critical systems where it is imperative there be no downtime. Exasperating the issue is the fact that downtime is usually a requirement for any type of major implementation. tekWorx has vast experience working on retrofitting such facilities and has developed a system that minimizes downtime while optimizing existing equipment. One such retrofit was completed for a Verizon telecommunication facility that is in operation 24/7 and generates approximately $1 million in revenue per hour. It goes without saying downtime here is very expensive.

Prior to tekWorx involvement at Verizon, the central plant’s efficiency was rated a 2 on a scale of 10. After optimizing and automating the system using adaptive algorithms, changes in valves, VFDs, and the tekWorx CEO®, the plant is not a 9 or 10. tekWorx solution included installing a 3-way valve in the place of a 2-way valve so as to eliminate too much water entering the bypass valve; this excess flow directly impacts the chiller ∆ T levels and prevents chiller plant efficiency. The pumps were then updated with VFDs, slowing the pumps down while still satisfying load requirements easily and efficiently. The tekWorx CEO® system employed several algorithms to control monitors chiller plant kW consumption and simultaneously adjust operation of individual components to effectively minimize energy consumption.

The enhanced reliability of the CEO® allows facility managers to feel more at ease in mission critical environments. For more information on how tekWorx has retrofitted similar facilities, check out our Results page.

Retrofitting the Better Buildings Challenge

In 2011 the Obama administration initiated the Better Buildings Challenge, a directive to reduce commercial energy consumption by 20% and to nationally reduce energy by $40 billion by 2020. Unfortunately, finding such savings can be incredibly difficult for buildings when energy hogs remain hidden in faulty lighting, AC, thermostats, furnaces, switches, and fans that malfunction or are altered by human activity. The Better Buildings Challenge has propelled itself back into the spotlight with the recent opening of Seattle’s Bullitt Center in April of 2013. Designed to be 83% more efficient than is typical for a building its size, the Bullitt Center is (self) described as the world’s greenest building. The building works to restore the “natural environment” via solar panels, occupancy sensors, energy emissions, and natural lighting. Regrettably, this architectural marvel does little to provide a roadmap for the energy personnel at existing structures.

Luckily, tekWorx has a successful solution for retrofitting existing facilities. Although an often overlooked area, significant savings are tied to analysis of the chiller plant operations. With at least 30% of all energy costs derived from a building’s cooling system, utilizing tekWorx’s adaptive CEO® system allows facilities to cut their central energy plant costs by as much as 50%. As an added bonus, tekWorx uses a plant’s existing equipment and BMS systems generally eliminating the need for additional capital investments.

To find out how tekWorx can help optimize your central plant and surpass the Better Buildings Challenge reduction goal, fill out our Chiller Plant Evaluation form.