https://www.tekworx.us/wp-content/uploads/contact-bg.jpg

In 2011 the Obama administration initiated the Better Buildings Challenge, a directive to reduce commercial energy consumption by 20% and to nationally reduce energy by $40 billion by 2020. Unfortunately, finding such savings can be incredibly difficult for buildings when energy hogs remain hidden in faulty lighting, AC, thermostats, furnaces, switches, and fans that malfunction or are altered by human activity. The Better Buildings Challenge has propelled itself back into the spotlight with the recent opening of Seattle’s Bullitt Center in April of 2013. Designed to be 83% more efficient than is typical for a building its size, the Bullitt Center is (self) described as the world’s greenest building. The building works to restore the “natural environment” via solar panels, occupancy sensors, energy emissions, and natural lighting. Regrettably, this architectural marvel does little to provide a roadmap for the energy personnel at existing structures.

Luckily, tekWorx has a successful solution for retrofitting existing facilities. Although an often overlooked area, significant savings are tied to analysis of the chiller plant operations. With at least 30% of all energy costs derived from a building’s cooling system, utilizing tekWorx’s adaptive CEO® system allows facilities to cut their central energy plant costs by as much as 50%. As an added bonus, tekWorx uses a plant’s existing equipment and BMS systems generally eliminating the need for additional capital investments.

To find out how tekWorx can help optimize your central plant and surpass the Better Buildings Challenge reduction goal, fill out our Chiller Plant Evaluation form.