Pharmaceutical Plant Optimization Saves $542,000, Earns $250,000 Utility Rebate
tekWorx solutions utilizes existing infrastructure for increased system efficiency and savings


Facility Bio
- Irvine, CA
- Three variable speed chillers and two constant speed chillers totaling 6,300 tons capacity
- Distributed campus load with five secondary cooling zones
- 11.5 cents blended utility rate

Situation
- Installed capacity not achievable due to hydronic issues, load shedding required on high wet bulb temperature days
- Enthalpy-driven cooling load
- Chillers run when outdoor air could meet space temperature and RH requirements
- Modifications over time created system and equipment imbalances
- BAS control system functional, but did not provide optimization

Solution
- Convert to full variable flow operation
- Integrate supervisory Control Engine Optimization (CEO®) with existing BAS
- Reset CHW supply temperature based on enthalpy
- Efficiency-based chiller sequencing to improve utilization and performance
- Reset zone DP setpoints to minimize flow and pump power
Results That Exceed Client Expectations

Financial Savings
- $542,000 annual utility cost savings
- $250,000 utility rebate
- Just under a 6-month payback with the rebate

Energy Impact
- >4,700,000 kWh saved annually

Operational Benefits
- Improved automation means less manual intervention
- Improved CHW temperature control reduces reheat load and cost
- Improved equipment utilization increases system redundancy
Still Have Questions?
Start saving on cooling costs.
Calculate your savings instantlyWe are the chilled water plant optimization experts
tekWorx optimization solutions consistently save faciliites 20-40% in annual energy costs. We'd love to help your facility do the same. Get in touch!