Campus Cuts Cooling Cost 25% and Recovers Lost Capacity
Tennessee Tech University incorporates tekWorx adaptive CEO® solution into “Cooling Deficiency Correction” program to cut energy costs and increase available capacity for campus expansion.


Facility Bio
- Cookeville, TN
- Central CHW plant serves 44 buildings
- Three (3) Trane constant speed chillers, 1 with integral HEX bundle
- 4,500 tons cooling capacity
- Unmanned operation during warmer months, cooling ~ 8 months/year

Situation
- Traditional Primary-Secondary hydronic system
- Low CHW ΔT, high kW/ton
- Andover control system, no optimization sequence
- No coordination between buildings and central plant

Solution
- Convert to full variable flow using Integrated Primary- Secondary® system design
- Implement tekWorx PLC-based adaptive Control Engine Optimization® solution
- Integrate with campus BAS to coordinate building and CUP pumping operation
Results That Exceed Client Expectations

Financial Savings
- $75,000 in annual energy savings
- 2-year project payback

Energy Impact
- 1,000,000 kWh saved annually
- .25 kW/ton efficiency improvement

Operational Benefits
- Improved CHW flow enabled higher building space temperatures
- Pumps running in most efficient range, reduced wear and maintenance
- Remote monitoring makes troubleshooting faster and less expensive
Still Have Questions?
Start saving on cooling costs.
Calculate your savings instantlySend us a message
At tekWorx, we value our relationship with each and every client. Contact us any time for engineering support or project inquiries.

Approachable Expertise ®
© 2020 tekWorx. All right reserved. Privacy Policy