Telecom Central Office Cuts Cost Without Disrupting Operations

tekWorx adaptive Control Engine Optimization® solution slashed chilled water costs and added redundancy to this mission critical facility with no downtime.

Facility Bio

  • Pittsburgh, PA
  • High traffic, downtown Central Office
  • 550,000 ft² downtown facility totaling 20 floors
  • Three (3) McQuay constant speed chillers
  • 4,500 tons cooling capacity
  • Mission critical, 24/7 operations

Situation

  • Major upgrade to chiller plant infrastructure
  • Upgrade could not disrupt Central Office traffic
  • Inadequate control redundancy for critical operation
  • Low ΔT and high kW/ton due to inefficient hydronic configuration and control sequence

Solution

  • Convert hydronic system to Variable-Primary configuration
  • Install redundant PLC-based Control Engine Optimization system(CEO®)
  • Integrate CEO® with Metasys building automation system

Results That Exceed Client Expectations

Financial Savings

  • $85,000 in annual energy savings
  • 2.3-year payback

Energy Impact

  • 1.3 million kWh saved annually
  • .36 kW/ton efficiency improvement

Operational Benefits

  • Control system upgraded to N+1 redundancy standard
  • Reduced troubleshooting response time
Still Have Questions?

Start saving on cooling costs.

Calculate your savings instantly.

We are the chilled water plant optimization experts

tekWorx optimization solutions consistently save faciliites 20-40% in annual energy costs. We'd love to help your facility do the same. Get in touch!

Approachable Expertise ®
4538 Cornell Road
Cincinnati, Ohio 45241
1-513-533-4777
[email protected]
© 2020 tekWorx. All right reserved. Privacy Policy