Facility Bio

  • 450,000 ft² transaction processing center
  • Three (3) Trane constant speed chillers
  • 2,100 tons cooling capacity
  • Traditional Primary-Secondary design
  • Standard BAS control sequence, no optimization

Situation

  • Client needed to meet corporate energy reduction goals
  • Mission critical facility, no operational downtime permitted
  • Optimization upgrade had to be compatible with existing BAS

Solution

  • Integrate Xpress® adaptive optimization® technology with existing JCI Metasys infrastructure
  • Supervisory configuration to:
    • Maintain existing field wiring
    • Reduce integration risk & installation time

Results That Exceed Client Expectations

Financial Savings

  • $43,000 in annual energy savings
  • 3-year payback

Energy Impact

  • 800,000 kWh saved annually
  • .21 kW/ton efficiency improvement

Operational Benefits

  • No disruption to site operations
  • Remote user access throughout facility
Still Have Questions?

Start saving on cooling costs.

Calculate your savings instantly

We are the chilled water plant optimization experts

tekWorx optimization solutions consistently save faciliites 20-40% in annual energy costs. We'd love to help your facility do the same. Get in touch!

Approachable Expertise ®
4538 Cornell Road
Cincinnati, Ohio 45241
1-513-533-4777
[email protected]
© 2020 tekWorx. All right reserved. Privacy Policy