Facility Bio

  • Tier 3 facility in Northeast US
  • Modular packaged plant
  • 3,600 ton initial capacity, expandable to 7,200 tons
  • Traditional Primary-Secondary pumping
  • No optimization sequence in place

Situation

  • Cooling capacity expansion initiated to meet server load growth
  • Additional chiller plant modules exceeded client budget and delivery time
  • tekWorx identified unusable current capacity due to low ΔT and excess flow

Solution

  • Convert to full variable flow to:
    • raise ΔT
    • improve chiller loading
    • recover unusable chiller capacity
  • Implement tekWorx CEO® system to minimize overall kW/ton
  • Provided opportunity for redundant PLC upgrade

Results That Exceed Client Expectations

Financial Savings

  • $3.5 million CapEx avoidance on additional chiller sets
  • $167,000 annual energy savings
  • 1-year payback

Energy Impact

  • 4.7 million kWh saved annually
  • 0.31 kW/ton efficiency improvement

Operational Benefits

  • No integration downtime
  • PLC control system upgraded to full N+1 redundancy
Still Have Questions?

Start saving on cooling costs.

Calculate your savings instantly

We are the chilled water plant optimization experts

tekWorx optimization solutions consistently save faciliites 20-40% in annual energy costs. We'd love to help your facility do the same. Get in touch!

Approachable Expertise ®
4538 Cornell Road
Cincinnati, Ohio 45241
1-513-533-4777
[email protected]
© 2020 tekWorx. All right reserved. Privacy Policy