Boston Teaching Hospital Cuts Energy and Water Use
Xpress® chilled water plant optimization solutions cut energy bills by a third while maintaining patient comfort and compliance

Facility Bio
- Boston, MA
- 800-bed teaching hospital
- 2,400 tons cooling capacity

Situation
- Variable/Primary hydronic system design
- Static CDW and CHW supply temperature setpoints year
- Invensys building automation system in good shape, no optimization sequence

Solution
- Integrate tekWorx Xpress® with existing Invensys system
- Supervisory control architecture to keep all existing equipment and wiring in place
- Install Energy Efficiency Dashboard
Results That Exceed Client Expectations

Financial Savings
- Energy costs reduced 33%
- 1 year project payback
- $30,000 utility rebate

Energy Impact
- Over 2,000,000 gallons of water saved annually

Operational Benefits
- Real-time energy data on all chilled water equipment
- Equipment running in most efficient range, reduced wear and maintenance needs
Still Have Questions?
Start saving on cooling costs.
Calculate your savings instantlyWe are the chilled water plant optimization experts
tekWorx optimization solutions consistently save faciliites 20-40% in annual energy costs. We'd love to help your facility do the same. Get in touch!

Approachable Expertise ®
© 2020 tekWorx. All right reserved. Privacy Policy