• facility bio

    Facility Bio

    • Greensboro, NC
    • 450,000 ft² transaction processing center
    • Three (3) Trane constant speed chillers
    • 2,100 tons cooling capacity
    • Traditional Primary-Secondary design
    • Standard BAS control sequence, no optimization
  • case study situation

    Situation

    • Client needed to meet corporate energy reduction goals
    • Mission critical facility, no operational downtime permitted
    • Optimization upgrade had to be compatible with existing BAS
  • case study solution

    Solution

    • Integrate adaptive Control Engine Optimization® technology with existing JCI Metasys infrastructure
    • Supervisory configuration to:
      • Maintain existing field wiring
      • Reduce integration risk & installation time

Results That Exceed Client Expectations

  • chiller plant optimization savings

    Financial Savings

    • $43,000 in annual energy savings
    • 3-year payback

     

  • chiller plant optimization energy savings

    Energy Impact

    • 800,000 kWh saved annually
    • .21 kW/ton efficiency improvement

  • Chilled water plant optimization operational benefits

    Operational Benefits

    • No disruption to site operations
    • Remote user access throughout facility